13.8KV Repairs at Eisenhower and Snell Lock Compressor Building Feeders
The Great Lakes St. Lawrence Seaway Development Corporation seeks a contractor to replace 13.8KV electrical cables feeding compressor buildings at Eisenhower and Snell Lock. The work also includes repairing a vault at Eisenhower Lock to stop water infiltration. Bids were due June 30, 2023.
Categories
Important dates
-
Pre-bid site visit
Thursday
-
Questions due
via email
-
Published
-
Submission deadline
Deadline passed
AI overview
As of 06/29/2023, the Past Performance Questionnaire is being included in the attachments section, as it was not added previously in error. //NOTHING FOLLOWS// The Great Lakes St. Lawrence Seaway Development Corporation (GLS) is issuing a Request for Quote for the furnishing of all plant, labor, equipment, materials, and labor to perform all work to replace the 13.8KV electrical cables referred to as Seaway 1 and Seaway 2. These cables feed the Compressor Buildings at the Eisenhower and Snell Lock locations. The Contractor must also repair the existing 13.8KV installation at Eisenhower Lock for the downstream vault to stop the water infiltration. GLS intends to award a Firm-Fixed Price (FFP) contract in accordance with (IAW) the subject Request for Quote (RFQ). Site Visit: Thursday, 08 June 2023, 10:00AM EST Questions Due via email: Tuesday, 13 June 2023, 2:00PM EST Offers Due via email: Friday, 30 June 2023, 2:00PM EST All quotes shall be submitted electronically. Fax and/or paper copies WILL NOT be accepted. Email one (1) copy in PDF format to the following: chora.snyder@dot.gov // NOTHING FOLLOWS //
Resources & contact
Proposal Document
View proposal documentSolicitation number
6923G523Q0806
Contact
- Chora Snyder
- chora.snyder@dot.gov
- 3157643206
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in