PSEG Long Island, as agent of and acting on behalf of LIPA, issued an RFP to acquire: (i) a minimum of 160 MWs of Load Reduction and/or Power Production resources by December 31, 2020, increasing yearly to a total of 275 MWs by the peak load period of 2030 to meet the resource needs in the Far Rockaway Load Area; (ii) a minimum of 100 MWs of Load Reduction and/or Power Production resources by December 31, 2020 to meet the resource needs in the Glenwood Load Area. After review of proposals, PSEG Long Island determined that the most economic solutions in both the Far Rockaway Load Area and the Glenwood Load Area were transmission solutions identified in Sections 1.2 through 1.4 of the 2016 WN RFP. The RFP was subsequently cancelled on August 16, 2016 and no projects were selected.