Expired RFP

2016 Western Nassau RFP

PSEG Long Island sought 160 MW of load reduction and/or power production for the Far Rockaway Load Area by end of 2020, scaling to 275 MW by 2030, plus 100 MW for the Glenwood Load Area by 2020 to address Western Nassau capacity needs. After evaluating proposals, the utility determined transmission solutions offered greater economic value and cancelled the RFP in August 2016 without selecting any projects.

PSEG Long Island NY

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

PSEG Long Island, as agent of and acting on behalf of LIPA, issued an RFP to acquire: (i) a minimum of 160 MWs of Load Reduction and/or Power Production resources by December 31, 2020, increasing yearly to a total of 275 MWs by the peak load period of 2030 to meet the resource needs in the Far Rockaway Load Area; (ii) a minimum of 100 MWs of Load Reduction and/or Power Production resources by December 31, 2020 to meet the resource needs in the Glenwood Load Area. After review of proposals, PSEG Long Island determined that the most economic solutions in both the Far Rockaway Load Area and the Glenwood Load Area were transmission solutions identified in Sections 1.2 through 1.4 of the 2016 WN RFP. The RFP was subsequently cancelled on August 16, 2016 and no projects were selected.

Resources & contact

Proposal Document

View proposal document

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in