Expired RFP

2021 All Source RFP for Electric Power Supply and Load Management Resources for Texas

El Paso Electric seeks 175–225 MW of generating capacity—renewable or conventional—online by May 2025 to serve Texas customers and replace retiring units ahead of anticipated summer peak demand. Short-term and long-term power supply contracts are both in scope, with deadline for submissions by December 2021.

El Paso Electric TX

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

El Paso Electric (EPE) issues an All Source Request for Proposal (RFP) to obtain short-term and/or long-term generating resources including renewable energy for Texas customers by 2025. The objective is to meet the growing customer demand EPE is experiencing, specifically for its Texas service territory, and to meet the anticipated 2025 summer peak. EPE's initial resource planning studies project a capacity need of approximately 175 to 225 megawatts (MW) before May 1, 2025. New generation is also necessary to offset EPE's planned retirements of older, less-efficient generating units.

Resources & contact

Proposal Document

View proposal document

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in