Expired RFP

2025 APCo PSA, PPA, and REC RFPs

Appalachian Power (APCo) is acquiring up to 800 MW of wind, solar, and/or battery energy storage capacity via 100% equity purchase agreements, with projects required to reach commercial operation by December 15, 2029 and interconnect to PJM or APCo's distribution system in the PJM footprint—Virginia and West Virginia sites preferred. Completed and development-stage projects qualify; PJM-interconnected wind and solar must be at least 50 MW, battery storage at least 10 MW, and APCo distribution-connected projects at least 10 MW. PJM Transition Cycle #2 projects are excluded.

Appalachian Power (APCo)

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

Up to 800 MW wind, solar and/or co-located or standalone battery energy storage systems RFP via one or more purchase and sale agreements (PSAs) for purchase of 100% equity interest in a project company. Bidders may propose completed or development stage projects that achieve a commercial operation date of no later than Dec. 15, 2029. To qualify for consideration, projects must interconnect to the PJM Interconnection L.L.C. RTO or the APCo distribution system, and be located within the PJM footprint, with a preference for projects located in Virginia or West Virginia on Eligible Sites. Projects that interconnect to PJM must be at least 50 MW in size for wind and solar and 10 MW in size for battery energy storage systems. In addition, projects that interconnect to the APCo distribution system must be at least 10 MW in size. PJM Transition Cycle #2 projects are no longer eligible to participate in this RFP.

Resources & contact

Proposal Document

View proposal document

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in