Unknown
RFP

2026 All Source RFP Q&A

Oklahoma Gas & Electric solicits generation and capacity proposals across solar, wind, battery storage, thermal resources, and hybrid projects—minimum 100 MW accredited capacity per bid, up to 10-year contract terms under PPAs, CPAs, PSAs, or Battery Tolling Agreements. Projects must interconnect to Southwest Power Pool and achieve commercial operation by March 15 of their online year. OG&E accepts bids for near and mid-term resource needs across multiple technology types and contract structures, with $10,000 non-refundable bid fee per submission.

Oklahoma Gas & Electric Co OK
Categories:
Power purchase agreements (PPAs) Renewable energy procurement Capacity/energy solicitations Transmission planning studies Interconnection studies Battery storage (utility-scale)

Important Dates

Deadline

Unknown

Published

AI Overview

OG&E's 2026 All Source Request for Proposal (RFP) solicits bids for power generation and capacity resources to meet Oklahoma Gas & Electric's near and mid-term resource requirements. The RFP accepts proposals for multiple technology types including solar, wind, battery energy storage systems (BESS), thermal resources (combustion turbine and reciprocating internal combustion engine), and hybrid projects combining multiple technologies.

Bidders may structure proposals under three primary contract types: Power Purchase Agreements (PPAs), Capacity Purchase Agreements (CPAs), and Power Supply Agreements (PSAs) for new projects, or Battery Tolling Agreements for standalone and hybrid BESS projects. All projects must achieve a minimum of 100 MW of seasonal accredited capacity per bid. For thermal resources and EPC projects, bidders must utilize OG&E Form Agreements, with separate agreements required for each technology in multi-technology projects. The maximum contract duration is 10 years for PPA and CPA bids.

Key technical requirements include: projects must interconnect to Southwest Power Pool (SPP); commercial operation date must be no later than March 15 of the year the facility comes online; intermittent resources (wind, solar) are exempt from the four-hour consecutive run time requirement; and projects utilizing OG&E's surplus interconnection must demonstrate full control of the project site (OG&E-owned land is not permitted). Bidders must provide accredited capacity calculations using SPP's 2025 Summer ELCC study and expected winter ELCC values for wind and solar resources, and must comply with SPP OATT Tariff Attachment AA requirements.

Submission requires a non-refundable bid fee of $10,000 per individual bid, with additional contract negotiation fees of $1/kW due within five business days of selection for negotiation. All bids must include comprehensive bid narratives covering project summary, environmental impact analysis, operations and maintenance plans, interconnection studies (preliminary SPP Phase 1 studies are acceptable), and technical specifications. All prospective bidders must execute a mutual Non-Disclosure Agreement with OG&E prior to accessing detailed Form Agreements and Technical Specifications.

Questions and clarifications regarding the RFP must be submitted through the official RFP email inbox at 2026AllSourceRFPComm@oge.com. Form Agreements became available the week of February 16, 2026. Bidders should reference the Code of Conduct document available on OG&E's website for information regarding RFP evaluation team members and code of conduct policies.

Resources & Contact

Contact Information

supplier@oge.com

Other open RFPs in this category

Active opportunities related to this one. Sign up for alerts to track new ones automatically.

1 days left
Jun 4, 2026

TVA – 2026 Existing Generation Resource Capacity RFP — Tennessee Valley Authority (TVA)

2 days left
Jun 5, 2026

Southern Spirit DC Tie Interconnection Study — ERCOT

2 days left
Jun 5, 2026 3:00 PM

2026 Renewable Energy Resource Acquisition — Colorado Springs Utilities

5 days left
Jun 8, 2026 7:00 PM

Solar and Energy Storage Feasibility Across Municipal Facilities — City of Pasadena

5 days left
Jun 8, 2026 9:00 PM

Design-Build Services for a Hydrogen Fueling Station — City of Pasadena - Public Works Department, Engineering