Expired RFO

2028-2031 Firm Zero-Emitting Integrated Resource Planning Reliability RFO

SDG&E is procuring 619.5 MW of zero-emitting and long-duration storage capacity to meet system reliability requirements by 2028–2031, with 41.4 MW of firm zero-emitting generation (≥80% capacity factor, non-weather-dependent) due online by June 1, 2028, and the remaining capacity spread across storage and other non-fossil resources through 2031. The RFO operates on a rolling monthly basis beginning July 1, 2025, accepting offers until further notice with 60-day shortlist notification windows.

San Diego Gas & Electric (SDG&E) CA

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

San Diego Gas & Electric Company (SDG&E) seeks through this Request for Offers (RFO) reopening to procure resources to meet electric system reliability needs as required by California Public Utilities Commission (CPUC) Decisions D.21-06-035, D.23-02-040, and D.24-02-047. The solicitation is for eligible system-level resource adequacy (RA) to come online by June 1, 2028, with consideration given to offers for resources that may come online by June 1, 2031. SDG&E is procuring a total of 619.5 megawatts (MWs) of net qualifying capacity (NQC) across multiple resource categories: Firm zero-emitting resources (41.4 MW by 2028), Long-duration storage resources (41.4 MW equally divided), and Any other type of non-fossil-fueled resource (536.6 MW from 2023-2027). Firm zero-emitting resources must be generation capacity with no on-site emissions or eligible under the Renewables Portfolio Standard program with at least 80 percent capacity factor, and must not be use-limited or weather dependent. No storage projects qualify under the firm zero-emitting provision. Long-duration thermal (LLT) resources with the following characteristics are eligible: Generation capacity with no on-site emissions or eligible under renewables portfolio standard with at least 80 percent capacity factor, not use-limited or weather dependent. The RFO operates on a rolling basis with monthly submission windows. SDG&E will accept offers until further notice, with the first offer window opening July 1, 2025. Subsequent windows open on the first business day of each month at 9:00 AM Pacific Prevailing Time and close on the last business day of the month at 5:00 PM PPT. SDG&E begins reviewing offers on the first business day of the following month. Respondents will be notified of shortlist status within 60 days of the offer closing date for the submission month.

Resources & contact

Proposal Document

View proposal document

Contact

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in