34.5-12.47 kV Power Transformer
Naperville, IL seeks design, manufacture, and installation of two 34.5-12.47 kV power transformers for Chicago Substation, with submission deadline June 22, 2026 at 7:00 PM.
Important Dates
Deadline
19 days remaining
Published
AI Overview
The City of Naperville Public Utilities Department seeks qualified vendors to design, manufacture, supply, factory test, deliver, install, and commission two (2) 34.5-12.47 kV Power Transformers for the Chicago Substation in Naperville, Illinois. The transformers must be complete with all accessories required for safe, efficient, and convenient operation within the specification scope. Transformers must be manufactured in the United States. The vendor's responsibilities include factory testing, delivery to the substation, placement on the company's foundation, dressing out, filling with oil, field testing, and providing installation supervision throughout the commissioning process.
Key Dates: Pre-proposal conference scheduled for June 8, 2026 at 7:00 PM. Questions and answers deadline is June 12, 2026 at 5:00 PM. Proposal submission deadline is June 22, 2026 at 7:00 PM.
Technical Specifications: The bid documents include detailed technical data specifications for 34 kV transformers, transformer bid sheets, and technical datasheets. Bidders must comply with all requirements outlined in the specifications including bushings, arrester testing equipment, and distribution power transformer standards. All bid documents and technical specifications are available for review.
Submission and Evaluation: Proposals must be submitted according to instructions in the bid documents. The City of Naperville General Terms and Conditions apply to this solicitation. Contractor safety orientation and insurance requirements are mandatory. Bids will be evaluated based on technical compliance, pricing, manufacturer experience, and delivery timeline.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
26-124