808258-RFP-2026-EHI-2R-Edmonton-ELY - EPCOR Harmony 2027 Cost of Service Design Study for Water and Wastewater
EPCOR seeks a cost of service and rate design expert to conduct a comprehensive, integrated COSS and provide harmonized rate design recommendations across water and wastewater utilities. Deadline April 24, 2026 at 2:01 PM MDT; 6-month project.
Important Dates
Deadline
Deadline passed
Published
AI Overview
EPCOR Harmony Inc. is seeking to engage a cost of service and rate design expert who is experienced in undertaking a comprehensive and integrated Cost of Service Study (COSS) and provide recommendations for designing rates using a harmonized approach across all utilities services. The successful consultant will conduct a detailed cost of service and rate design analysis for water and wastewater utilities, integrating findings across multiple utility services.
The project duration is 6 months from contract commencement. The study will involve comprehensive analysis of cost allocation methodologies, rate design principles, and recommendations for harmonized rate structures that can be applied consistently across water and wastewater service delivery.
Bid submissions are to be made online only through the EPCOR bidding platform. The question deadline is Monday, April 20, 2026 at 2:01 PM MDT, allowing bidders to seek clarifications on the RFP requirements and project scope. A comprehensive bid package is provided, including the main body document, appendices with detailed requirements, and a response form template that must be completed by bidders.
The bid documents include: Main Body (16 pages), Appendix 1 with detailed requirements (11 pages), Appendix 1 Attachment 1 providing additional technical specifications (20 pages), Appendix 1 Attachment 2 with supplementary information (7 pages), and the Response Form (11 pages). Two addenda have been issued with clarifications and modifications to the original RFP.
Resources & Contact
Posting URL
View Original Posting