Expired
RFB

Albert Whitted Airport ‐ Airfield Electrical Vault Rehab (Project No. 23159-100)

City of St. Petersburg seeks bids for airfield electrical vault rehabilitation at Albert Whitted Airport, including emergency generator installation, electrical/HVAC upgrades, and site improvements; bids due June 5, 2025 at 7:00 PM.

Engineering
Categories:
Construction & Field Services

Important Dates

Deadline

Deadline passed

Published

AI Overview

The City of St. Petersburg is seeking competitive bids from qualified contractors for improvements at Albert Whitted Airport, specifically addressing the airfield electrical vault rehabilitation. The project scope includes installing an emergency backup generator at the airfield vault, upgrading and replacing outdated wiring, chases, regulators, and other worn electrical components. Work will encompass structural and building system enhancements, including comprehensive electrical and HVAC upgrades to bring the facility to current standards.

Additional site improvement work involves grading and sodding, installing an asphalt access driveway, constructing a gravel bed, and modifying the existing drainage system to support the enhanced infrastructure. The project is categorized under Airport Facility Construction with a solicitation number IFB-25-217 (Project No. 23159-100).

Key dates for this procurement include a pre-proposal meeting on May 12, 2025 at 7:00 PM, a question and answer deadline of May 22, 2025 at 4:00 PM, and a firm bid submission deadline of June 5, 2025 at 7:00 PM. All bidders are required to provide a bid bond, public construction bond, and comply with Florida Trench Safety Act requirements. Submission materials must include detailed cost proposals using the provided pay items price page and adherence to all contract specifications and bid plans.

Resources & Contact

Solicitation Number

IFB- 25 - 217