All Requirements Retail Electric Power Supply for Municipal and Government Accounts
Cape Light Compact seeks retail electric power supply for approximately 75,000 MWh annually across 1,500 accounts serving 21 Cape Cod and Martha's Vineyard towns and Dukes County municipalities. Proposals must cover all-requirements supply including energy, capacity, ancillary services, and renewable compliance under Massachusetts Clean Energy Standard and Clean Peak Energy Portfolio Standard mandates, with contract terms of 1–3 years at fixed annual pricing and service starting July 2024 meter reads. Bidders may propose optional renewable energy content above state requirements and a capacity savings credit for a battery storage system installation.
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
Request for Proposals for all-requirements retail electric power supply serving approximately 1,500 electric accounts representing approximately 75,000 MWh of annual retail sales for 21 Cape Cod and Martha's Vineyard towns and Dukes County municipalities. The RFP seeks proposals for complete retail electric power supply including electrical energy, capacity, ancillary services, renewable energy resources as mandated by Massachusetts law (G.L. c. 25A, §§11F, 11F1/2), Clean Energy Standard requirements (310 C.M.R. §7.75), Clean Peak Energy Portfolio Standard (G.L. c. 25A §17(c) and 225 CMR 21.00), and transmission and distribution losses. The supplier will be responsible for all load and supply scheduling, ISO New England transactions and communications, network transmission service scheduling, customer billing support, customer complaint handling, EDI functions, and competitive supply provision. Bidders may propose contract terms of 1-3 years with fixed annual pricing. Bidders are invited to propose optional renewable energy content options above state-mandated requirements through additional MA Class 1 REC procurement. An optional capacity savings credit for a single account with a planned battery energy storage system installation is also available. Price offers must be fixed annually and include separate components for base power supply charges and estimated ISO-NE reliability program costs (Mystic Generating Station cost of service and Inventoried Energy Program charges). Seasonal, time-of-day, variable, or indexed pricing is prohibited. Service commencement is July 2024 meter read dates.
Resources & contact
Proposal Document
View proposal documentUnlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in