Annual Supply of EPA Protocol Specialty and Calibration Gases - McIntosh and Larsen Energy Production Plants
EPA Protocol specialty gas supply for Lakeland Electric's McIntosh and Larsen power plants; bidders must participate in EPA Protocol Gas Verification Program; submission deadline September 25, 2025.
Important Dates
Deadline
Deadline passed
Published
AI Overview
Lakeland Electric seeks reputable and well-established suppliers of EPA Protocol specialty gases for its Power Generation Units at the McIntosh and Larsen Power Plants. All bidders or suppliers must be current participants in the EPA's Protocol Gas Verification Program (PGVP) for stationary source monitoring. The scope includes providing annual supplies of EPA Protocol specialty and calibration gases to support continuous emissions monitoring systems (CEMS) at multiple power generation facilities.
Lakeland Electric operates the McIntosh, Larsen, and Winston Peaking Station Power Generation Facilities in Lakeland, Florida. The McIntosh Power Plant consists of two natural gas combustion turbines (Units MGT1: GE Frame 5N, 14MW; MGT2: Siemens 501D, 80MW); two diesel generating units (MD1 and MD2: GE, 2MW each); Unit 5, a natural gas combined cycle 380MW plant comprising a Siemens 501G turbine, Nooter Eriksen HRSG, and Siemens BB33 Steam Turbine; and the MREP Plant with six MAN 18-cylinder Reciprocating Internal Combustion engines (RICE).
Key dates include a Q&A deadline of September 18, 2025 at 21:00 and a proposal submission deadline of September 25, 2025 at 19:00. Bidders may request site visits at the power plants by contacting Todd Glidewell through the Question and Answer Tab on OpenGov. The procurement is managed by Lakeland Electric's Production Division, with Todd Glidewell serving as the Purchasing Agent and Matthew Brown as the Engineering Technician contact.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
2025-RFP-070