B002-23 SOUTH WASTEWATER TREATMENT PLANT SLUICE GATE REPLACEMENT
Sluice gate replacement at South Wastewater Treatment Plant Chlorine Contact Chamber; RFB posted October 2022, now awarded.
Important Dates
Deadline
Deadline passed
Published
AI Overview
This project involves the replacement of sluice gates at the South Wastewater Treatment Plant (SWWTP) Chlorine Contact Chamber (CCB). The work is part of the water and wastewater infrastructure maintenance program operated by Brownsville Public Utilities (BPUB).
The scope of work includes removal and replacement of existing sluice gates with new equipment meeting specified technical requirements. Detailed specifications, drawings, and construction requirements are provided in the bid documents. The project was publicly solicited through a competitive bidding process to select a qualified contractor to perform the installation and related work.
All bidders were required to submit proposals in accordance with the provided specifications and drawings. The bid tabulations document shows the evaluation and selection results from the competitive bidding process. Contractors needed to demonstrate competence in wastewater treatment plant equipment installation and maintenance.
The project was initially posted with a start date of October 3, 2022, and has since been awarded. Reference documents including detailed specifications, technical drawings, and bid tabulation results are available for review.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
B002-23