Brandy Branch Generating Station 89SS and 89MD Replacement
JEA is replacing controls for nine switches (six 89MD and three 89SS units) that supply starting power to stator windings across three combustion turbine generators at Brandy Branch Generating Station. The scope includes design, furnish, installation, commissioning, and a detailed commissioning report for the static start sequence system.
Categories
Important dates
-
Submission deadline
Deadline passed
AI overview
Furnish and design customized controls for six 89MD switches and three 89SS switches to provide starting power to generator stator during static start sequence for three combustion turbine generators. Bidder shall assist with Installation, Commission and provide detailed commissioning report.
Resources & contact
Proposal Document
View proposal documentSolicitation number
1412151446
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in