Cane Island 2 Fuel Oil Tank Refurbishment
FMPA seeks bids for the refurbishment of the fuel oil tank at the CI2 power plant in Intercession City, Florida. Key deadlines: proposals due August 11, 2026, with a mandatory pre-bid conference on July 28, 2026.
Categories
Important dates
-
Published
-
Mandatory pre-bid conference and site visit
At CI2 plant site in Intercession City, FL
-
Questions due
-
Submission deadline
Deadline passed
AI overview
The Florida Municipal Power Agency (FMPA) is issuing a Request for Proposals (RFP) for the refurbishment of the fuel oil tank at the Cane Island 2 (CI2) power plant located in Intercession City, Florida. The project scope includes all labor, materials, equipment, and supervision necessary to refurbish the existing fuel oil tank in accordance with the specifications provided in the RFP document. Key dates for this opportunity include a submission deadline of August 11, 2026 by 2:00 PM Eastern Time. A mandatory pre-bid conference and site visit will be held on July 28, 2026 at 10:00 AM Eastern Time at the CI2 plant site. Questions from bidders are due by August 4, 2026 at 2:00 PM Eastern Time. The RFP document contains detailed technical specifications, general conditions, and insurance requirements that govern the project.
The successful contractor will be required to provide a comprehensive refurbishment of the fuel oil storage tank, which is integral to the plant's operations. The work involves surface preparation, coating application, and all associated ancillary work to ensure the tank meets operational and regulatory standards. The contractor must also provide a detailed project schedule, safety plan, and quality control plan as part of their proposal. The RFP outlines specific performance standards, warranty requirements, and acceptance testing criteria that must be met upon completion of the work.
Proposals will be evaluated based on the criteria detailed in the RFP, which typically include the contractor's experience with similar tank refurbishment projects, the proposed technical approach, project schedule, safety record, and total cost. The evaluation will also consider the responsiveness of the proposal to the requirements set forth in the RFP documents. FMPA reserves the right to reject any or all proposals and to waive any irregularities in the submission process.
Submission instructions require that one original and two copies of the proposal, along with an electronic copy on USB drive, be delivered to the FMPA offices at 1350 South Powerline Road, Suite 200, Ocoee, Florida 34761. All proposals must be clearly marked with the RFP title and the bidder's name. The proposals must remain valid for a period of 90 days after the submission deadline. Additional documents, including the full RFP pdf, can be accessed through the link provided on the FMPA portal.
Resources & contact
Proposal Document
View proposal documentUnlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in