FMPA seeks a qualified contractor to design, engineer, procure, install, test, and commission new 4kV switchgear and generator protective relays at the CI3 facility in Cottondale, Florida. Proposals are due November 1, 2026, with a mandatory pre-bid conference on October 1, 2026.
Categories
Important dates
-
Published
-
Mandatory pre-bid conference
Held at the CI3 facility, Cottondale, FL
-
Deadline for written questions
Submit questions to FMPA
-
Submission deadline
Deadline passed -
Anticipated award
FMPA intends to issue award decision
AI overview
The Florida Municipal Power Agency (FMPA) is soliciting bids for a comprehensive project to upgrade the existing 4kV switchgear and generator protective relays at the CI3 (Cottondale Interconnect 3) facility. This project is part of FMPA's ongoing efforts to modernize electrical infrastructure and ensure the reliability and safety of power generation and distribution systems. The scope of work includes the design, engineering, procurement, installation, testing, and commissioning of new 4kV switchgear and generator relay systems. All work must be performed in compliance with applicable industry standards, including those from the National Electrical Code (NEC), Institute of Electrical and Electronics Engineers (IEEE), and the Occupational Safety and Health Administration (OSHA).
Key requirements for responding bidders include demonstrating proven experience with similar switchgear and relay upgrade projects, providing a detailed project plan and schedule, and submitting comprehensive technical documentation. The selected contractor will be responsible for all aspects of the project, including the removal of existing equipment, installation of new switchgear and relays, conducting all necessary testing and commissioning, and providing training to FMPA personnel. The project will be executed at the CI3 facility located in Cottondale, Florida. The deadline for proposal submission is November 1, 2026, at 2:00 PM Eastern Time. Proposals must be submitted via email to the designated contact, and a mandatory pre-bid conference is scheduled for October 1, 2026, at 10:00 AM Eastern Time at the CI3 facility.
Additional key dates include a deadline for written questions on October 10, 2026, and FMPA anticipates issuing an award decision by December 1, 2026. The project is expected to be completed within 12 months of the notice to proceed. FMPA will evaluate proposals based on several criteria, including technical approach and experience (30%), project schedule (20%), relevant experience and qualifications (20%), and total cost (30%). The RFP document provides detailed specifications for the switchgear and relay requirements, including voltage ratings, interrupting capacity, and communication protocols. FMPA reserves the right to reject any or all proposals and to waive any irregularities in the submission process.
Resources & contact
Proposal Document
View proposal documentUnlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in