CONSTRUCTION OF AIRPORT SUBSTATION AND CONTROL BUILDING
Construction of airport substation and control building for Brownsville Public Utilities; RFB closed as of July 2024 with documents available through BPUB procurement.
Important Dates
Deadline
Deadline passed
Published
AI Overview
This project involves the construction of a new airport substation and associated control building. The scope of work includes the design and construction of electrical infrastructure to support airport operations, including the substation structure, control building facilities, and related electrical systems and equipment installation.
The proposal was publicly solicited by Brownsville Public Utilities (BPUB) and documents were made available for bid reference. The procurement included bid documents and two addenda to the original specifications, indicating modifications or clarifications to the original scope during the bidding process.
All bid submission requirements, technical specifications, and evaluation criteria are contained in the comprehensive bid documents available through the BPUB procurement office. Interested contractors were required to contact the procurement department for submission instructions and any technical questions regarding the project scope and requirements.
The project was closed to new submissions as of the listing date, with the bid status marked as closed.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
B058-24