Deerhaven Unit 1 Stack Repair
GRU seeks contractors for Deerhaven Generation Station Unit 1 Stack repairs including refractory liner, brick lining, and mortar work; proposals due April 4, 2024 at 6:00 PM.
Categories
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
Gainesville Regional Utilities (GRU) is soliciting qualified contractors for repairs to the Deerhaven Generation Station Unit 1 Stack. The scope of work includes filling and sealing hairline cracks on the exterior surface, repairing the interior upper approximately 60 feet of the gunite refractory liner, repairing brick lining as needed, replacing missing sections of the liner, and repairing or replacing mortar associated with the brick lining in the top 60 feet and bottom 5 feet of the stack.
Key dates for this procurement include a pre-proposal meeting scheduled for February 28, 2024 at 3:00 PM, a question and answer deadline of March 15, 2024 at 6:00 PM, and a proposal submission deadline of April 4, 2024 at 6:00 PM. Reference materials include inspection reports from 2017 and December 15, 2022, stack drawings, and a pre-bid meeting agenda.
Proposals should include a pricing proposal and technical submittals demonstrating the contractor's qualifications and approach to completing the repairs. The evaluation will assess contractor capability, experience with similar work, proposed methodology, schedule, and pricing.
Submissions should be directed to the GRU Procurement contact, with technical questions directed to the engineering contact listed. All proposals must comply with general terms and conditions, supplemental conditions, and federal requirements as outlined in the solicitation documents.
Resources & contact
Proposal Document
View proposal documentSolicitation number
RFP-2024-056
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in