Expired RFP

Design-Build Services for Standby Generator at Clearwater Executive Airport CNG Station

The City of Clearwater seeks qualified design-build teams for the selection, purchase, and installation of a CNG-powered standby emergency generator at the Clearwater Executive Airport CNG Station. Proposals are due October 22, 2026, at 2:00 PM ET via the city's procurement portal. The project includes design, equipment procurement, and construction with detailed technical specifications provided in attached exhibits.

City of Clearwater FL

Categories

Backup power / standby generators

Important dates

  • Published

  • Q&A Deadline

  • Submission deadline

    Deadline passed

AI overview

The City of Clearwater is seeking responses from qualified design-build teams with expertise in the selection, purchase, and installation of a compressed natural gas (CNG)-powered standby emergency generator at the Clearwater Executive Airport CNG Station. The project requires a complete design-build solution including geotechnical assessment, equipment procurement, site preparation, installation, and commissioning of the generator system. The selected vendor will be responsible for all aspects of the project from initial design through final acceptance testing.

The solicitation is issued as a Request for Qualifications (RFQ) under solicitation number 59-26. Key dates include a Q&A deadline of October 12, 2026 at 2:00 PM ET, and a proposal deadline of October 22, 2026 at 2:00 PM ET. The solicitation was posted on September 18, 2026. All responses must be submitted through the City of Clearwater's procurement portal as detailed in the solicitation documents.

Technical specifications and supporting documents are provided as attachments, including a geotechnical engineering report, CNG as-built drawings, equipment pad details, property survey, site plan, Duke Energy commercial service information form, and specifications for low-voltage distribution transformers, gas-engine-driven generator sets, and transfer switches. These documents define the technical requirements for the generator installation, including integration with existing CNG station infrastructure and utility coordination.

Evaluation criteria are outlined in the solicitation and will focus on the qualifications and experience of the design-build team, technical approach, and compliance with city requirements. The project is located at the Clearwater Executive Airport in Clearwater, Florida. Interested vendors should review all attached exhibits carefully and submit any questions by the Q&A deadline to ensure consideration.

Resources & contact

Proposal Document

View proposal document

Solicitation number

59-26

Contact

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in