Expired
RFP

ELECTRIC COST OF SERVICE & RATE STUDY

BPUB seeks a consultant to conduct a comprehensive electric cost of service and rate study to support utility rate-setting and regulatory filings; RFP closed January 16, 2024.

Brownsville Public Utilities Board TX
Categories:
Regulatory & Rates Rate design Cost of service studies

Important Dates

Deadline

Deadline passed

Published

AI Overview

Brownsville Public Utilities Board (BPUB) is seeking qualified consultants to conduct a comprehensive electric cost of service and rate study. This engagement requires a detailed analysis of the utility's electric system costs, cost allocation methodologies, and rate design recommendations. The study will serve as a foundation for BPUB's rate-setting decisions and regulatory filings.

The scope of work includes conducting a thorough cost of service analysis to identify the costs associated with providing electric service across different customer classes and rate schedules. The consultant will develop cost allocation methodologies, prepare cost of service studies, and provide rate design recommendations. The study must comply with regulatory standards and industry best practices for utility rate analysis.

Key deliverables include detailed cost of service documentation, rate design alternatives, and supporting analyses. The consultant will work with BPUB staff to understand the utility's operational structure, financial data, and strategic objectives. Detailed technical requirements and scope specifications are available in the bid documents and addendum.

The RFP was opened on January 16, 2024. All bid documents and addenda are available for reference. Prospective bidders should contact the utilities procurement office for any clarifications or additional information needed to prepare their proposals.

Resources & Contact

Solicitation Number

P025-24