Energy Storage & Distribution Deferral (ES&DD)
Southern California Edison is soliciting energy storage resources and preferred resources (renewable energy, storage, capacity, load reduction, or ancillary services) to defer distribution upgrades at four designated substations and specific circuit segments on its system. Option 1 targets Resource Adequacy from energy storage resources; Option 2 is all-source, accepting renewables, storage, demand reduction, and ancillary services to address distribution constraints. Projects must electrically interconnect to SCE's specified substations or qualifying circuit segments.
Important dates
No dates available.
AI overview
The Energy Storage and Distribution Deferral Request for Offers consists of two procurement options: Option 1 is a solicitation for Resource Adequacy from eligible Energy Storage Resources (ESRs) as defined in CPUC Decision 13-10-040. The ESRs must electrically connect to one of four designated substations on SCE's system. Option 2 is an all-source solicitation for renewable energy, energy storage, capacity, load reduction, resource adequacy, ancillary services and/or renewable attributes from eligible Preferred Resources for purposes of distribution deferral. The projects must electrically connect to designated substations or a qualifying segment of designated circuits on SCE's system.
Resources & contact
Proposal Document
View proposal documentUnlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in