FE18-06 (Construction), CENGEN INSTRUMENT AIR COMPRESSORS REPLACEMENT AT PLANT NO. 1
Instrument air compressor system replacement at a power generation facility in Fountain Valley, CA, including complete system design, installation, and auxiliary equipment; deadline 2026-03-11.
Important Dates
Deadline
Deadline passed
Published
AI Overview
This invitation for bid solicits competitive bids for the replacement of the existing Instrument Air Compressor System at a power generation facility. The work encompasses complete removal and installation of the instrument air compressor system, including associated piping, auxiliary equipment, valves, electrical connections, instruments, controls, and other ancillary features in the CenGen building and Power Building 3A. The project involves building equipment installation and coordination with facility operations.
Key dates for this procurement include a pre-proposal conference scheduled for 2026-02-11 at 6:30 PM, a questions and answers deadline of 2026-02-19 at 12:00 AM, and a final proposal submission deadline of 2026-03-11 at 6:00 PM. All submissions must be received by the deadline to be considered responsive.
Bidders must review the complete bid set documentation, which includes the Notice Inviting Bids, front-end documents and specifications (Divisions 1-17), and construction plans. Technical specifications and detailed requirements are contained in the bound volumes that define the scope of work, materials, equipment standards, and installation methodologies required for this project.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
FE18-06 (Construction)