Fire Suppression Testing for Glenarm Power Plant
Pasadena Water & Power seeks qualified vendors for 3-year fire suppression system inspection contract at Glenarm Power Plant (5 natural gas turbine units, 26-71 MW each). Proposals due January 29, 2026; includes annual inspections and BRYCER compliance reporting.
Important Dates
Deadline
Deadline passed
Published
AI Overview
Pasadena Water and Power (PWP), a department of the City of Pasadena, is soliciting bids from qualified vendors to conduct yearly fire suppression system inspections for all generation units at the Glenarm Power Plant. The contract is for a 3-year term with annual fire inspection services required for each location. Vendors must include inspection report uploads to the BRYCER compliance engine as part of their service delivery.
The Glenarm Power Plant consists of five natural gas-fired combustion turbine units. Four simple cycle units are included: GT-1 and GT-2 are 1970s-era Curtiss-Wright gas turbines rated at 26 MW each, while GT-3 and GT-4 are GE LM6000 simple cycle gas turbines with 47 MW capacity each. GT-5 is a combined cycle unit featuring a GE LM6000 gas turbine paired with a Shin Nippon Steam Turbine for a total combined capacity of 71 MW. These units primarily provide power generation during peak demand periods.
Key dates and requirements include: Q&A deadline of January 19, 2026 at 10:00 PM Pacific Time, and proposal submission deadline of January 29, 2026 at 9:00 PM Pacific Time. Vendors must submit relevant experience forms, complete technical questionnaires, provide Unique Entity ID verification through SAM, disclose any lobbying activities, and certify federal compliance. Insurance requirements and city-specific terms apply.
Resources & Contact
Posting URL
View Original PostingSolicitation Number