FORCE MAIN IMPROVEMENTS FOR RIVER WOODS SUBDIVISION AND SURROUNDING AREAS
Force main wastewater infrastructure improvements for River Woods Subdivision in Brownsville, TX; RFP B070-22 closed with bid tabulations available.
Important Dates
Deadline
Deadline passed
Published
AI Overview
This proposal involves force main infrastructure improvements for the River Woods Subdivision and surrounding areas in Brownsville. The project encompasses the design and construction of force main improvements to support wastewater system expansion and enhancement in the designated service area. Detailed technical specifications, drawings, and project requirements are provided in the accompanying bid documents.
The project was solicited under RFP Number B070-22 and was closed as of the posting date. Bid tabulations and final construction drawings have been made available for reference. The scope of work includes all labor, materials, equipment, and services necessary to complete the force main improvements in accordance with the technical specifications and construction drawings provided.
Contractors interested in similar future opportunities or requiring clarification on this closed bid should contact Diane Solitaire at the Brownsville Public Utilities contact information provided. All supporting documentation, including bid tabulation results and detailed construction drawings, is available through the referenced PDF links.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
B070-22