FVA Terminal Tank Rehabilitation
IFB for rehabilitation of fuel storage tank at FVA Terminal in Colorado. The project covers cleaning, repair, and recoating. Bids due September 16, 2026.
Categories
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
Scope of Work
The FVA Terminal Tank Rehabilitation project involves comprehensive rehabilitation of existing fuel storage tanks at the FVA Terminal located in Colorado. Work includes tank cleaning, removal of sludge and debris, inspection for structural integrity, repair of any defects, and application of protective coatings and linings. The contractor will be responsible for all labor, materials, equipment, and safety measures required to complete the rehabilitation in compliance with applicable environmental and safety regulations.
Key Requirements
Contractors must have demonstrated experience in aboveground storage tank rehabilitation, including certifications for confined space entry, hazardous waste handling, and coating application. All work must be performed in accordance with API 653 standards and local environmental regulations. The scope may include cathodic protection testing, leak testing, and re-commissioning of the tank. Detailed specifications, drawings, and bid documents are available to registered vendors.
Submission Details
The IFB closing date is September 16, 2026 at 5:00 PM MDT. Interested bidders must register on the issuing platform to access the full solicitation package. The contract will be awarded based on a combination of technical approach, past performance, and pricing. Pre-bid meetings or site visits, if any, will be announced in the bid documents.
Resources & contact
Proposal Document
View proposal documentSolicitation number
IFB-KSK-G9043
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in