Unknown
RFP

IGP RFP - Oahu

Hawaiian Electric seeks renewable energy and energy storage proposals on Oahu and Hawaii Island—wind, solar, geothermal, biomass, biofuels, and standalone battery storage—with commercial operations by December 1, 2029 or 2033 to support grid decarbonization and rate stabilization under its Integrated Grid Plan. Pre-screened interconnection points on both islands include newly added 69kV lines on the Big Island as of March 2026. Projects sited in prioritized Renewable Energy Zones and avoiding wildfire risk areas receive evaluation credit alongside cost.

Hawaiian Electric Company, Inc. HI
Categories:
Power purchase agreements (PPAs) Renewable energy procurement Capacity/energy solicitations Battery storage (utility-scale)

Important Dates

Deadline

Unknown

Published

AI Overview

Hawaiian Electric is conducting a competitive solicitation for renewable energy and energy storage resources to support grid modernization, rate stabilization, and energy equity objectives outlined in the Company's Integrated Grid Plan filed in Docket No. 2018-0165. The IGP RFP seeks proposals for variable and firm renewable energy generation as well as energy storage resources on Oahu and Hawaii Island, including but not limited to wind, solar, geothermal, biomass, biofuels, and standalone energy storage projects. The RFP aims to advance decarbonization of the electric grid while managing affordability, resilience, and reliability.

Key dates include: Draft IGP RFP filed April 30, 2024; updated draft filed June 6, 2025; final updated draft filed July 7, 2025. Public comment periods and community engagement meetings have been conducted to gather stakeholder feedback. A technical conference is planned for late 2025. Projects are expected to achieve Guaranteed Commercial Operations Dates (GCOD) by December 1, 2029 and December 1, 2033.

Proposals must include detailed facility technical models prepared by qualified engineering consultants. Pre-screened interconnection locations are identified on Oahu and Hawaii Island, with additional locations added as of March 24, 2026 (69kV Kilauea-Puna and 69kV Kilauea-Kamaoa lines for Hawaii Island). The evaluation process incorporates non-price factors including energy equity considerations, siting in prioritized Renewable Energy Zones (REZ), and wildfire risk area avoidance. Wildfire risk area shapefiles and REZ shapefiles are available upon request to qualified proposers who have executed a Mutual Confidentiality and Non-Disclosure Agreement (NDA).

Proposers must execute an IGP Mutual Confidentiality and Non-Disclosure Agreement with Hawaiian Electric to access pre-screened substation layouts, high-level interconnection maps, and land RFI results. The form is non-negotiable and must be digitally signed in Adobe. All facility models must be developed by qualified engineering consultants, with Hawaiian Electric providing a list of study consultants with prior procurement experience.

Resources & Contact

Other open RFPs in this category

Active opportunities related to this one. Sign up for alerts to track new ones automatically.

1 days left
Jun 4, 2026

TVA – 2026 Existing Generation Resource Capacity RFP — Tennessee Valley Authority (TVA)

2 days left
Jun 5, 2026 3:00 PM

2026 Renewable Energy Resource Acquisition — Colorado Springs Utilities

5 days left
Jun 8, 2026 7:00 PM

Solar and Energy Storage Feasibility Across Municipal Facilities — City of Pasadena

5 days left
Jun 8, 2026 9:00 PM

Design-Build Services for a Hydrogen Fueling Station — City of Pasadena - Public Works Department, Engineering

5 days left
Jun 8, 2026 6:00 PM

Replace CAISO Remote Intelligent Gateway (RIG) and CAISO Meters — City of Pasadena - Water & Power Department, Power Supply