K059--626A4-18-204 Upgrade Energy Management System

The Department of Veterans Affairs seeks construction services to upgrade the Energy Management System and Building Automation System at the Alvin C. York VA Medical Center. The project includes converting DDC controls to Native BACnet, installing a fiber optic backbone, and replacing outdated control panels. Bids were due April 2, 2024, but the solicitation has been cancelled.

VETERANS AFFAIRS, DEPARTMENT OF - 249-NETWORK CONTRACT OFFICE 9 (36C249)

Categories

Construction & Field Services Energy Management System (EMS)

Important dates

  • Published

  • Site visit

    Sign in sheet provided via Amendment 0001

  • Submission deadline

    Deadline passed

AI overview

Amendment 0004 is to cancel solicitation. Amendment 0003 is to extend bid opening. Amendment 0002 is to extend bid opening. Amendment 0001 is to extend bid opening and provide site visit sign in sheet. STATEMENT OF WORK Department of Veterans Affairs TVHS, Alvin C. York Campus Construction Requirements Project 6264A-18-204 Upgrade Energy Management System GENERAL INFORMATION Introduction: The VA s existing Building Automation System (BAS) Direct Digital Controls (DDC) systems are manufactured by Siemens and Alerton. The Engineering Control Center (ECC) is in the chiller plant and the Boiler Plant Operator Room. These systems currently operate via V-LAN (Virtual Local Area Network) and fiber RS-485. These control systems, along with many of their outdated control panels, manage various Air Handling Units, Chiller, and Boiler plant operations. Present DDC systems are a mix of proprietary and non-backwards compatible frameworks that are incapable of functioning as a system to allow control as required across the facility. This requirement will upgrade the existing Energy Management System and Building Automation System and remove existing system(s) in Buildings at TVHS Alvin C. York VA Medical Center. This solicitation will result in one award for the project. Scope of Work: Provide construction services to upgrade existing Energy Management System to Desigo CC or equivalent and Building Automation System for Project 6264A-18-204 at the Tennessee Valley Healthcare System Alvin C. York Campus at 3400 Lebanon Rd, Murfreesboro, TN 37129, in strict accordance with the specifications and drawings. Contractor will provide professional services to convert Direct Digital Controls (DDC) system to industry standard Native DDC front-end and panels, fiber optic backbone to all panels, replace outdated controls and panels, and add controls to key areas. The contractor shall furnish all labor, material, equipment, and supervision necessary to successfully complete all work as described. The job includes controls, programming, structured cabling, low-voltage electrical and architectural for patch back, tuning, fire alarms, certification/commissioning, and general construction. At the conclusion of these upgrades, there will be a new Fiber Optic backbone, ALL panels will be Native-BACnet supporting all equipment, and there will be a new front-end with new graphics for a unified and certified/commissioned BACnet System. Performance Period: The contractor shall complete the work required under this statement of work (SOW) within the 365 calendar days from date of the Notice to Proceed, which includes all work, submittals, material lead times, inspection, and closeout. Unless otherwise stated, any modifications required under the resulting contract and shall be submitted by the contractor and approved by the Contracting Officer (CO). Project Objectives: Convert existing BAS communications from V-LAN to Fiber Optic serving Fan Rooms. Replace each Control Panel, tie in and integrate all existing field devices/feeds. Replace or integrate existing Non-BACnet devices, analog inputs, and NOTIFER Fire Alarm. Provide any necessary conversion modules/cards, controllers, devices, sensors, boxes, armored cable, supports, instrumentation, programming, and controls. System supplier shall submit point-to-point Engineered drawings, control sequence, and bill of materials for approval. Remove old V-LAN cabling once new system(s) is installed AND operational. Replace listed (Attachments A) Alerton and Siemens control panels and associated components with Native BACnet. Upgrade existing DDC system to function as an integrated and open system to allow control of the entire DDC system across the facility. Provide professional services to ensure a complete and fully functional BAS upgrade, including coordination and installation of sensors, controls, and modifications. Contractor provided professional services will include, but is not limited to, general construction, controls, programming, structured cabling, low-voltage electrical and architectural for patch back, tuning, fire alarms, and certification. Coordination drawings shall include all components and exact utility routing, sizing, capacity, location, and arrangement/configuration. SPECIFIC TASKS AND ASSOCIATED DELIVERABLES Description of Tasks and Associated Deliverables: Contractor shall provide construction services within the specified period of performance in accordance with the statement of work and specifications including all documentation, schedules, submittals, coordination, certifications, test reports, training, warranties, manuals, etc. as specified in the contract documents. Work includes but is not limited to: Upgrade all the existing Control Panels from the V-LAN to fiber communications. Installation shall comply with ASHRAE Standard 135 BACnet protocol. All new fiber lines installed shall terminate in fiber patch panels/hubs. All fiber optic lines are to be installed in armored (not Clad), independently supported, riser-, plenum-rated cable with independent penetrations, unless contractor can tie to a nearby cable tray or noted otherwise. Existing V-LAN lines supporting building service equipment shall remain active until new, fiber lines are installed, and new system is operational supporting the building service equipment. Once new system is operational, remove/demolish all existing wire from old backbone/loop, conduit to remain. All the fiber switches must be located in Fan Rooms for easy access, no switches above celling. Provide a Fiber Optic Backbone (minimum 10 GBPS) serving all Fan Rooms and back to the head-end. Contractor to submit stamped, backbone coordination drawings showing floorplans and riser diagrams. Although fiber distances are not specified, contractor shall be conscious of data transmission rates/speeds and performance requirements of specifications (system response times) (Specification 230923 Direct Digital Control System for HVAC). Upgrade existing Building Automation System Siemens and Alerton Legacy Control Panels to Native BACnet for the panel, but not limited to, systems listed below: Operation Room Panel for air cooler Chiller and the arctic chiller. Chiller panel interface modules shall be upgraded to interface with the new Panel Controller. Air cooler chiller located in building 10, panel controller and chiller s panel interface module shall be upgraded to interface with the new panel controller. Air cooler chiller located in building 11, panel controller and chiller s panel interface module shall be upgraded to interface with the new panel controller. The existing larger field panels (MBC s) shall be replaced with Modular PXC s or equivalent listed in Attachment A Control Panel Schedule. The existing medium sized panels (MEC s) shall be replaced with PXC-36 modular or equivalent listed in Attachment A Control Panel Schedule. Additional BAS control enclosures required to complete the migration of existing control points are to be provided by the control s contractor. New BAS control enclosures are to be installed in each AHU s respective mechanical room. Enclosures shall have hinged, locking doors. Provide laminated plastic nameplates for all enclosures in any mechanical room or electrical room. Include location and unit served on nameplate. Laminated plastic shall be 0.125 inches thick and appropriately sized to make label easy to read. Upgrade the existing DDC system to function as an integrated and open system to allow control of the entire DDC system across the facility. The combined system shall be Desigo CC or equivalent to operate and function as one complete system including one database of control point objects and global control logic capabilities. The contractor shall observe the capabilities, communication network, services, spare capacity of the existing control system and its ECC prior to beginning work. DDC shall communicate directly with the new native-BACnet devices over the existing control system s communications network without the use of a gateway. Provide a combined system server that must be compatible with all existing/newly installed control points and systems. Provide programming converting the existing non-BACnet devices, objects and services to ASHRAE Standard 135 BACnet-complaint BIBB s (BACnet Interoperability Building Blocks). Facility operators and select engineering personnel shall have complete operation and control capability over all systems, new and existing, including monitoring, trending, graphing, scheduling, alarm management, global points sharing, global strategy deployment, graphical operations interfaces and custom reporting as specified. The direct-digital control (DDC) combined front-end system Desigo or equivalent shall start and stop equipment, move (position) damper actuators and valve actuators, and vary speed of equipment to execute the mission of the control system. Use electricity as motive force for all the damper and valve actuators, unless use of pneumatic as motive force is specifically granted by the VA via formal correspondence. Control System shall accommodate two (2) Engineering Control Center workstations and the control system shall accommodate up to ten (10) web-based users simultaneously. Access to the system should be limited only by individual, specific operator username and password. The operator shall be able to remotely access and operate the system. Remote access shall allow the operator to function the same as local access. BAS supplier shall provide Web-based access to the system as part of standard installation. User must be able to access all displays of real-time data that are part of the BAS using a standard Web browser. Web browser shall tie into the network through Owner-supplied Ethernet network connection. Web page host may be a separate device that resides on the BAS BACnet network, but is not the BAS server for the control system. BAS server may be a separate computer from the Web page host device. The Web page software shall not require a per-user licensing fee or annual fees. The Web page host must be able to support simultaneous users with the ability to expand the system to accommodate an unlimited number of users. All digital and analog output overrides, temperature setpoints, Proportional Integral Derivative (PID) Loop configuration/tuning parameters, timed overrides and key parameters shall be adjustable from the combined front-end DDC and Web Interface. The operator shall be able to periodically adjust parameter within the application, such as reset schedule values, timing parameters, calibration offsets, tuning parameters, set point values, globe/zone/VAV/TU schedules, and be able to manually override of output points and manual overrides of physical sensor values or states. Overrides shall change color state while the point is in override. This shall be displayed on the web graphic depicting the point, and in a summary page of all active overrides. Must tune, see Specification for Response requirements. Maintenance Management (PM): The program shall monitor equipment status and generate maintenance messages based upon the operator s defined equipment run time, starts, and/or calendar date limits. A preventative maintenance alarm shall be printed indicating maintenance requirements based on pre-defined run time. The system shall update all dynamic points with current data within eight (8) seconds. Data refresh shall be automatic, without operator intervention. Combined front-end system shall allow trending of any point/object, hardware or software virtual. Include tabular and graphical formats, simulation display of multiple values, user adjustable ranges and scaling, high resolution capable sampling on PID control loops, archiving and storage. The combined system server shall start the trending and be able to store the data for a minimum of one (1) year. The combined system shall trend all points available on the systems and equipment listed, but not limited to: Air Handling Units, Chiller Plant, Boiler Plant, VAV Boxes for each AHU, Chiller One (1), Chiller Two (2) and Chiller Three (3), and OR Chiller, Fans, Pumps, Booster Pumps, Fans Coils, Heat Exchangers, Exhausts Fans, and Domestic Hot Water. Each newly installed server and panels shall have sufficient memory to support its own operating system, including data sharing. Combined system shall be able to provide a table for each Air Handling Units VAV boxes and contain the points below VAV Box Name VAV Box Location VAV Supply Temperature VAV Supply CFM Upgrade Combined Front-end Graphic Displays Provide a Graphic Floor Plan that will include locations of key space sensors, associated exhaust fans, fire/smoke damper locations and status, set-point adjustment and color band displays, floor plan maps that show heating and cooling zones throughout the building with user definable colors. Provide custom graphics and images of the combined front-end system for, but not limited to: System BAS graphics shall follow the VA site approved structure standards. All BAS graphics shall be installed on the existing Siemens (or equivalent) Frontend. Graphics must display all mission critical points, as determined by VA. System Graphics shall be equipment specific and schematically correct for each system. (i.e. coils, fans, dampers located per equipment supplied with project.) Standard system graphics that do not match equipment or system configurations are not acceptable. Operator shall have capability to manually operate the entire system from each graphic screen at the ECC. Each system graphic shall include a button/tab to display the applicable sequence of operation. Animation shall be used for rotation or moving mechanical components to enhance usability, such as to show if louvers/valves are open, closed or partially open. Dynamic temperature values, humidifier values, flow rates, and status indication shall be shown in their locations and shall automatically update to represent current conditions without operator intervention and without pre-defined screen refresh values. Color shall be used to indicate status and change in status of the equipment. The state colors shall be user definable. A clipart library of HVAC equipment, such as chillers, boilers, air handling units, fans, terminal units, pumps, coils, standard ductwork, piping, valves and laboratory symbols shall be provided in the system. The operator shall have the ability to add custom symbols to the clipart library. A dynamic display of the site-specific architecture showing status of the controllers, the ECC and network shall be provided. The windowing environment of the workstation shall allow the user to simultaneously view several applications at a time to analyze total building operation or to allow the display of graphics associated with an alarm to be viewed without interrupting work in progress. The graphic system software shall also have the capability to split screen with half portion of the screen with graphical representation and the other half with sequence of operation of the same HVAC system. Provide Graphical engineering tools shall include Device Manager for detection of devices connected anywhere on the BACnet network by scanning of the entire network. This function shall display device instance, network identification, model number, and description of connected devices. It shall record and display software file loaded into each controller. A copy of each file shall be stored on the computer s hard drive. If needed, this file shall be downloaded to the appropriate controller using the mouse. Provide a Software Configuration Tools, including the software to modify graphics, upload and download controllers, and re-configure the sequence of operation as programmed in the stand-alone controllers. Provide Scheduling and Alarm Management software. The new control systems (PXCM, PXC36, or equivalent) shall be designed such that each mechanical system shall Operate as a Stand-Alone Mode . The contractor administered by this Section of the technical specifications shall provide a single host equipment controller for each mechanical system. In the event of a network communication failure, or the loss of any other controller, the control system shall continue to operate independently. Failure of the ECC shall have no effect on the field controllers, including those involved with global strategies. Multiple serial (MSTP) Host controller per a single piece of equipment, i.e., AHU, RTU, Chiller, Etc., shall be unacceptable. Host Equipment Controllers can be as required MSTP to IP BACNet routers. When mixing MSTP device brands, all devices must be ASHRAE certified BACNet compliant and have been tested before installation for compatibility. Programmable MSTP Devices are only allowed if they can be accessed for program and point database editing from the Siemens (or equivalent) server / client. CONTRACTOR GENERAL REQUIREMENTS Statement of Bid item: Controls System Upgrade: Work includes installation of new campus Energy Management System fiberoptic network in new conduit and existing underground signal conduit system, installation of new DDC controllers and fiberoptic switches in new enclosures, new power feeds (normal and standby) to new DDC controllers and switches, extension of existing controls I/O wiring to new control panels, programming of new controllers, creation of new custom graphics for all equipment, complete system testing, and removal of all existing fiberoptic cable and empty conduit once new system has been tested and placed in service. Fully Functional & Complete: When furnish , provide , install , construct , convert , upgrade or similar term is used, it shall mean a complete installation by the contractor, fully functional and ready for use, including all supervision, coordination, labor, materials, equipment and to perform the job, as well as all associated costs, such as disposal, handling, delivery/transportation, storage, fees, taxes, etc. For the purposes of this contract/project, if direction/statement is silent as to who shall performs work or provides services/items, it is meant to be the contractor s responsibility. Modern/Up-to-Date Equipment & Open Systems: Provide modern systems incorporating modern components. Components/devices/modules/items/etc. shall have been developed within the last 5 years. When items cite compliance with codes/guidelines/standards, they shall be the most recent, up-to-date version. All components must still be in production and widely used/available. No discontinued items are allowed. Software shall be the most current version. No proprietary components or systems, included but not limited to, gateways, communication bridges, protocol translators or any other device that translates any proprietary or other communication protocol to the BACnet communication protocol shall be permitted as a part of the BAS installation. Gateways may only be used as required for communication to existing systems or systems installed as part of this project. Network/Controls Architecture and Software shall be Open License and require no annual/reoccurring fees for continual access. Time for Deliverables (5-day max): Unless noted otherwise, any written milestone or deliverable shall be provided within 5 days. VA reviews of a deliverable shall also be completed within 5 business days from the date of receipt. If revisions are required, the contractor shall deliver any revisions within 5 days from the date of receipt. All written deliverables shall be phrased in lay person language. Interchangeable Language: For the purpose of the Scope of Work, these words are used interchangeably: Mechanical Room = Fan Room = Equipment Room Native-BACnet = BACnet Front-end = Head-end Certification = Compliance Certify = Comply Panel = Control Panel = Pier-to-Pier (P2P) Network Days = Calendar Days Survey of Existing Conditions: The Dep

Resources & contact

Proposal Document

View proposal document

Solicitation number

36C24924B0009