Lincoln Electric System – Request for Information Wind/Solar

Lincoln Electric System (LES) is seeking information on wind and/or solar projects via a Power Purchase Agreement (PPA) to leverage federal tax credits. Preferred projects are 50-150 MW within the Southwest Power Pool (SPP) footprint with a 20-30 year PPA term and ability to qualify for Clean Electricity Investment or Production Credits. Responses are due July 21, 2026.

Lincoln Electric System NE

Categories

Power purchase agreements (PPAs) Renewable energy procurement Capacity/energy solicitations

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

Lincoln Electric System (LES) is issuing this Request for Information (RFI) to gather market intelligence on wind and/or solar generation projects that could be procured through a Power Purchase Agreement (PPA). The primary goal is to identify projects that can still leverage the outgoing federal tax credits, specifically the Federal Clean Electricity Investment Credit or the Federal Clean Electricity Production Credit. LES is a public power utility serving Lincoln, Nebraska, and is looking to add cost-effective renewable energy to its resource portfolio.

LES has specified a set of preferences for projects submitted in response to this RFI. Preferred projects should have a nameplate rating between 50 MWAC and 150 MWAC, a PPA term of 20 to 30 years, and be located within the footprint of the Southwest Power Pool (SPP) regional transmission organization. Additionally, projects must demonstrate the ability to secure the applicable federal clean electricity tax credits. There is no stated limit on the number or size of projects that may be submitted, but the preferences indicate the scale and location that LES is most interested in.

Responses to this RFI are due by July 21, 2026. The full RFI document, including detailed submission instructions and additional qualifications, is available for download from the North American Energy Markets Association (NAEMA) website. NAEMA is posting this RFI on behalf of LES. All inquiries regarding this RFI should be directed to NAEMA at the contact information provided on the posting page.

This RFI is a market-sounding exercise and not a binding procurement. No budget figures or evaluation criteria have been disclosed. The information gathered will be used by LES to inform future competitive solicitations. Developers with suitable wind or solar projects in the SPP region that meet the size and timeline requirements are encouraged to respond.

Resources & contact

Proposal Document

View proposal document

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in