Links to Pre-bid Meeting Presentation, Minutes and Recording

Jamaica's Generation Procurement Entity is seeking proposals for up to 100 MW of utility-scale renewable generation capacity (solar PV, wind, or other renewable resources) on a Build, Own and Operate basis, with selected developers responsible for design, permitting, financing, construction, and long-term operations. Evaluation emphasizes technical merit, financial competitiveness, and operational experience; pre-bid meeting materials from February 23, 2024 are available for download.

Generation Procurement Entity (GPE), Jamaica JM
Categories:
Power purchase agreements (PPAs) Renewable energy procurement Independent power producer (IPP) contracts

Important Dates

Deadline

Unknown

Published

AI Overview

The Generation Procurement Entity (GPE) is seeking proposals for the supply of up to 100 MW (net) of electricity generation from renewable energy resources on a Build, Own and Operate (BOO) basis. This RFP invites qualified independent power producers and renewable energy developers to design, construct, own, and operate renewable generation facilities that will deliver electricity to the GPE.

The project encompasses the development of utility-scale renewable energy generation capacity, with potential technologies including but not limited to solar photovoltaic systems, wind generation, or other renewable energy resources. Respondents are expected to provide comprehensive proposals detailing project design, construction timelines, operational capabilities, pricing structures, and long-term operational commitments.

Key dates include a pre-bid meeting held on February 23, 2024, with meeting minutes, presentation materials, and recording available for reference. These pre-bid materials provide essential information regarding proposal requirements, technical specifications, evaluation criteria, and clarifications on the solicitation process.

Proposals submitted in response to this RFP will be evaluated based on technical merit, financial competitiveness, operational experience, and ability to meet the GPE's renewable energy generation requirements. The BOO structure requires the selected respondent(s) to assume responsibility for all aspects of facility development, including permitting, financing, construction, and ongoing operations and maintenance throughout the contract term.

Resources & Contact

Other open RFPs in this category

Active opportunities related to this one. Sign up for alerts to track new ones automatically.

1 days left
Jun 4, 2026

TVA – 2026 Existing Generation Resource Capacity RFP — Tennessee Valley Authority (TVA)

2 days left
Jun 5, 2026 3:00 PM

2026 Renewable Energy Resource Acquisition — Colorado Springs Utilities

5 days left
Jun 8, 2026 7:00 PM

Solar and Energy Storage Feasibility Across Municipal Facilities — City of Pasadena

5 days left
Jun 8, 2026 9:00 PM

Design-Build Services for a Hydrogen Fueling Station — City of Pasadena - Public Works Department, Engineering

6 days left
Jun 9, 2026 11:59 PM

Solar PV Located in Non-traditional Terrain (SPLINT) — California Energy Commission