Mendoza Substation A-frame Addition
Bluebonnet Electric Cooperative seeks bids for Mendoza Substation A-frame addition with engineering specifications provided; deadline July 2, 2026 at 2:00 PM.
Categories
Important dates
-
Submission deadline
Deadline passed
AI overview
Bluebonnet Electric Cooperative is soliciting bids for the addition of an A-frame structure at the Mendoza Substation. This project involves the design and construction of A-frame infrastructure at an existing substation facility. The bid package includes engineering documentation and specifications for the proposed work.
Vendors interested in submitting bids must download the complete bid package, which contains detailed engineering plans, technical requirements, and submission instructions. The bid package is available for download on the Bluebonnet Electric Cooperative website.
All bids must be submitted by the deadline of July 2, 2026 at 2:00 PM. Late submissions will not be accepted. Contractors should review all documentation thoroughly before preparing their proposals to ensure full compliance with the specifications and requirements outlined in the bid package.
Resources & contact
Proposal Document
View proposal documentUnlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in