Expired RFP

Mulberry Energy Center Inlet Filter House Replacement

FMPA seeks design-build-and-commission services for a complete replacement inlet filter house facility at Mulberry Energy Center, with execution in 2026. The project encompasses full engineering, materials procurement, construction management, and commissioning to meet current operational and regulatory standards. Qualified contractors must demonstrate prior experience with similar inlet and filter house infrastructure projects.

FMPA (Florida Municipal Power Agency) FL

Categories

Engineering Services Construction & Field Services

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

This Request for Proposal (RFP) seeks qualified contractors to design, engineer, and construct a replacement filter house facility at the Mulberry Inlet location. The project involves the complete replacement of the existing inlet filter house infrastructure with a new facility that meets current operational requirements and regulatory standards. The scope of work includes design and engineering services, procurement of materials and equipment, construction management, and commissioning of the new filter house facility.

The project is being issued by the Florida Municipal Power Agency (FMPA) for execution in 2026. Interested vendors must submit comprehensive proposals that address all technical specifications, project scheduling, quality assurance measures, and cost estimates. The RFP document contains detailed requirements for the design phase, construction methodology, equipment specifications, testing and commissioning procedures, and project timeline milestones. All submissions must comply with FMPA's procurement standards and contractual requirements.

Proposals should include detailed project schedules, resource plans, quality management approaches, safety protocols, and cost breakdowns. Vendors are required to demonstrate relevant experience with similar inlet and filter house projects, appropriate licensing and certifications, and financial capacity to execute the work. The evaluation process will assess technical merit, cost competitiveness, schedule feasibility, and contractor qualifications.

Resources & contact

Proposal Document

View proposal document

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in