NE WRF Influent Building Floor Repair
The City of Clearwater is seeking bids for grating replacement at the influent building and splitter box of the Northeast Water Reclamation Facility. The project involves demolition and installation of new grating with a 365-day contract time. Bids are due August 27, 2026 via the procurement portal.
Categories
Important dates
-
Published
-
Pre-proposal conference
-
Q&A deadline
-
Submission deadline
Deadline passed
AI overview
The City of Clearwater, Florida, through its Public Works Department, is soliciting bids for the replacement of grating at the influent building and splitter box at the Northeast Water Reclamation Facility (NE WRF). The project requires the contractor to demolish and dispose of existing grating over the channels in the influent headworks building and through to the splitter box, and install new grating. The contractor must furnish all labor, materials, equipment, tools, services, and incidentals to complete the work as specified in the contract documents. All work must be performed complete, in place, and ready for continuous service, including repairs, testing, permits, cleanup, replacements, and restoration of any damages caused during construction. The contractor is responsible for complying with all applicable local, state, and federal codes. The contract time for completion is 365 days from the notice to proceed.
Key dates for this solicitation include a pre-proposal conference scheduled for August 6, 2026, at 2:00 PM ET, a Q&A deadline of August 12, 2026, at 5:00 PM ET, and a final bid submission deadline of August 27, 2026, at 6:00 PM ET. The solicitation was posted on July 22, 2026. All bids must be submitted through the City's procurement portal.
The project is an invitation for bid (IFB) under solicitation number 25-0004-UT. The awarded contractor will be expected to perform the work in accordance with the provided technical specifications, general conditions, supplemental specifications, pricing sheet, and submittal requirements. The contract documents include detailed plans and specifications attached to the solicitation. The contractor must provide all equipment and skills necessary to complete the work in a substantial manner, even if not explicitly stated in the documents, without additional compensation.
Resources & contact
Proposal Document
View proposal documentSolicitation number
25-0004-UT
Contact
- Kelly Rogers
- kelly.rogers@myclearwater.com
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in