Expired RFP

P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA

The Department of Defense seeks a design-build contractor for 8.5 MW of Battery Energy Storage Systems at two sites on MCAGCC, Twentynine Palms, California. The BESS units will integrate with existing solar PV and a microgrid to provide grid stability, black-start capability, and peak demand reduction. Proposals are due September 27, 2024.

DEPT OF DEFENSE - NAVFACSYSCOM SOUTHWEST CA

Categories

Generation Renewable energy procurement Battery storage (utility-scale) Microgrid design & operation

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.

Resources & contact

Proposal Document

View proposal document

Solicitation number

N6247324R5227

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in