Expired
RFB

Park Substation Line Extension Project

12kV underground electrical infrastructure installation along Santa Ana Canyon Road in Anaheim, CA; contractors must be prequalified on PUD Transmission/Distribution list; 10% bid bond required; deadline March 12, 2026.

Public Works
Categories:
Substation construction Distribution line construction Underground cable installation Distribution engineering/design

Important Dates

Deadline

Deadline passed

Published

AI Overview

The Park Substation Line Extension Project, coordinated with the Gypsum Canyon Memorial Park Development, involves the installation of new 12kV underground electrical infrastructure along Santa Ana Canyon Road from Woodcreek Road to Gypsum Canyon Road in Anaheim, California. This project focuses on extending transmission and distribution electrical systems to support the park development.

Contractors bidding for the electrical portion of this project must be on the Public Utilities Department's current prequalified Transmission and Distribution Electrical Contractors List for 2021-2026. Prime contractors must hold a current and valid "A-General Engineering" license classification, with subcontractors performing high voltage electrical work requiring a "C-10" classification. DIR registration is required for both prime and subcontractors. A 10% bid bond is required, and liquidated damages are assessed at One Thousand Dollars ($1,000) per day. This project is exempt from the Community Workforce Agreement (CWA) as electric utility work on high voltage utility equipment and special utility construction work are specifically excluded.

Key dates for this solicitation include a non-mandatory pre-bid meeting scheduled for February 17, 2026, at 2:00 pm via Microsoft Teams, a questions and answers deadline of February 28, 2026, at 1:00 am, and a proposal submission deadline of March 12, 2026, at 9:00 pm. Detailed technical specifications and project plans are available in the attachments section.

Proposal responses should address the pricing proposal, evaluation criteria, and vendor questionnaire sections. All submissions must be made through the designated procurement portal with complete documentation of qualifications, prequalification status, and licensing information.

Resources & Contact