Path Two 35kV Cable Replacement Project Construction

City of Pasadena seeking qualified contractors to remove existing and install new 1250 KCMIL 35kV subtransmission cable (approximately 240,152 feet) within existing conduit systems; proposal deadline October 20, 2025 at 8:00 PM.

City of Pasadena CA
Categories:
Transmission Construction & Field Services Transmission line construction Underground construction

Important Dates

Deadline

Deadline passed

Published

AI Overview

The City of Pasadena Water and Power Department is soliciting competitive bids from qualified contractors to provide construction services for the Path Two Cable Replacement Project. The scope of work includes removal of existing underground 35kV subtransmission cable and installation of new City-furnished 1250 KCMIL Triplex cable within existing conduit systems. The contractor will be responsible for managing approximately 240,152 feet of 1250 KCMIL Compact Copper, 35kV, 100% Insulation EPR, 1/6 Flat Strap cable, with full delivery expected prior to construction start.

This project is part of Pasadena Water and Power's long-term initiative to improve the reliability of its 35kV subtransmission system. The existing underground cables serving as a key subtransmission route are nearing the end of their useful life and require replacement to maintain system integrity, support long-term load growth, and reduce the risk of unplanned outages. PWP serves over 65,000 residential, commercial, and industrial customers within the City of Pasadena.

Key project dates include a pre-proposal meeting scheduled for September 11, 2025 at 5:00 PM, a questions and answers deadline of September 18, 2025 at 5:00 PM, and a proposal submission deadline of October 20, 2025 at 8:00 PM. Bidders must submit all required forms and certifications including faithful performance bond, material and labor bond, relevant experience documentation, federal certifications, and subcontractor listings.

Bidders are required to comply with State of California prevailing wage requirements, federal contract provisions, and HUD requirements where applicable. Insurance requirements, public contract claims procedures, and FEMA Emergency Management Agency terms and conditions apply. The contract will be administered under the Master Labor and Materials Contract template with competitive bidding procedures per PMC 4.08.045.

Resources & Contact

Solicitation Number

2025-IFB-LM-0355

Contact Information

Antonio Watson

awatson@cityofpasadena.net