PERALTA HILLS SANITARY SEWER IMPROVEMENT
The City of Anaheim is seeking a qualified consultant to provide comprehensive plans, specifications, and estimates (PS&E) for the Peralta Hills Sanitary Sewer Improvement Project. The project involves upsizing existing 6-inch sewer pipe to 8-inch in the Peralta Hills neighborhood. Proposals are due October 15, 2026.
Categories
Important dates
-
Published
-
Q&A Deadline
-
Submission deadline
Deadline passed
AI overview
The City of Anaheim (City) is seeking proposals from qualified consultants to develop comprehensive plans, specifications, and estimates (PS&E) for the Peralta Hills Sanitary Sewer Improvement Project. The project is located in the Peralta Hills neighborhood, specifically covering Peralta Hills Drive, Cerro Vista Drive, Peralta Way, and Cerro Vista Way. The primary scope involves upsizing the existing 6-inch sanitary sewer pipe to an 8-inch pipe to improve capacity and reliability. The selected consultant will be responsible for delivering a complete PS&E package, including recommendations for the most effective and least impactful construction methods for the neighborhood.
The consultant will work under the direction of the City's Public Works Department. Key responsibilities include conducting field surveys, performing engineering analysis, preparing construction drawings, specifications, cost estimates, and providing alternative solutions. The consultant must also address federal, state, and local requirements, including environmental and regulatory compliance. The project schedule requires the consultant to complete the PS&E within a defined timeline, with the overall project expected to proceed to construction following design approval.
Proposals are due by October 15, 2026, at 5:00 PM Pacific Time. A Q&A deadline is set for October 8, 2026, at 5:00 PM Pacific Time. All communications and submissions are to be handled through the City's procurement portal. The procurement contact is Yvonne Dake-Okewole, Project Manager, who can be reached at yokewole@anaheim.net or (714) 765-4913. The City reserves the right to reject any and all proposals and to waive informalities.
The selection process will evaluate proposals based on qualifications, proposed approach, experience with similar sanitary sewer improvement projects, and the submitted fee schedule. Consultant teams are expected to demonstrate expertise in civil engineering, sanitary sewer design, and environmental compliance. The contract will be awarded to the most responsive and responsible proffer. The City emphasizes minimizing neighborhood disruption during construction and values innovative, cost-effective solutions.
Resources & contact
Proposal Document
View proposal documentContact
- Yvonne Dake-Okewole
- yokewole@anaheim.net
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in