The U.S. Army Corps of Engineers, Tulsa District, is soliciting bids for the removal of 15 existing power poles and installation of 15 new poles with accessories, plus right-of-way clearing at the Tenkiller Project Office. Work includes tree removal and trimming. Bids are due September 22, 2023.

DEPT OF DEFENSE - W076 ENDIST TULSA

Categories

Pole inspection/replacement Overhead line construction Tree trimming/removal

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

Contractor shall be responsible for providing all supervision, labor, tools, equipment, and other incidental items (unless otherwise noted) necessary for the removal of 15 existing power poles and the purchase and reinstallation/replacement of a total of 15 new power poles, with the appropriate cross arms, insulators ,guywires, and other needed accessories. Extra guy wires will be installed to secure entire electrical service. All installation will be in accordance with state and local requirements and specifications. Power poles, accessories, disconnect, and transformer shall be new and meet current NESC industry standards. Contractor shall also be responsible for providing all supervision, labor, tools, equipment, and other incidental items (unless otherwise noted) necessary for the clearing of existing electrical service right of way by tree removal and tree trimming. These items have been divided into a BASE with TWO OPTIONS, and will be performed at the Tenkiller Project Office location: BASE - Contractor will remove 12 existing power poles. Contractor will purchase and install 12 new power poles, with all new associated cross-arms, cutouts, fuses, accessories, guy wires, anchors, etc. Extra guy wires will be installed to secure entire electrical service.? OPTION 1 - Contractor will clear approximately 1,800 linear feet of existing right of way to the appropriate width. This work will include tree removal and tree trimming. Right of way width should be to where a fallen tree or limb will not disrupt electric power service. Trees that are removed will be to ground level.? OPTION 2 - Contractor will remove 3 existing power poles. Contractor will purchase and install 3 new power poles, and all associated cross-arms, cutouts, fuses, accessories, guy wires, anchors, etc., purchase and install 1 new electrical disconnect with breaker and riser with weather head, and purchase and install 1 pole mount pot type transformer with appropriate voltage size. This is not an amendment. Rather, it is intended to rectify the oversight in omitting the Statement of Work in the release of W912BV23Q0089.

Resources & contact

Proposal Document

View proposal document

Solicitation number

W912BV23Q0089

Unlock Full Access to Utility Proposals