Prefabricated Control Building for 115kV Substation (Seward Substation)
Nebraska Public Power District procures one prefabricated control building (14' × 65') for assembly at the Seward 115kV Substation, including all labor, materials, and logistics to ready the structure on existing pier foundations. Assembly and demobilization must be complete per the District's substation timeline. Bids due May 27, 2026.
Important Dates
Deadline
3 days remaining
Published
AI Overview
Nebraska Public Power District (NPPD) is seeking bids for the procurement and assembly of one prefabricated substation control building measuring 14 feet by 65 feet for installation at the District's Seward 115 kV Substation. The scope of work includes all planning, material coordination, schedule preparation, labor, supervision, miscellaneous materials, tools, apparatus, equipment, conveyances, mobilization, assembly, and demobilization necessary to complete the project. The contractor shall assemble the control building on pier foundations that will be designed and installed by others.
Key Dates: The request for bid was made available on May 13, 2026, at 1:15 p.m. CDT. A non-mandatory pre-bid meeting will be held on Microsoft Teams on May 19, 2026, at 10:00 a.m. CDT to review contract specifications and allow prospective bidders to ask questions and seek clarifications. The bid submission deadline is May 27, 2026, at 5:00 p.m. CDT.
Prospective bidders are strongly encouraged to participate in the pre-bid meeting to ensure they fully understand all contract requirements and can submit complete and specification-compliant bids. All call-in information for the Microsoft Teams meeting is available on the ProcureWare website at www.nppd.com under the Bids & Contracts section. Detailed project information and specifications can be found in the Documents tab of the procurement system.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
RFB No. 26045