Purdy Landfill Solar Project
Procurement and Contract Division — Installation of a grid-tied solar generation system at the Purdy Landfill. The project shall include all necessary design work, submittals, shop drawings, and calculations required for the Owner’s submitt
Categories
Important dates
-
Submission deadline
Deadline passed
AI overview
Installation of a grid-tied solar generation system at the Purdy Landfill. The project shall include all necessary design work, submittals, shop drawings, and calculations required for the Owner’s submittal review procedure. Once the appropriate submittal review designation has been provided by the Owner, the Contractor will purchase and provide the above indicated items for a complete, functional grid-tied solar generation system.
Resources & contact
Proposal Document
View proposal documentSolicitation number
2025-MPW-049
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in