Greenville Utilities Commission is re-bidding reinforced concrete foundations for Boviet Substation in North Carolina, including control house pad, generator pads, distribution transformer pads with oil containment, nine drilled pier types (P1–P9), and breaker pads, with an 8-week completion window from notice to proceed and site readiness anticipated mid-July. Work requires permanent casings or slurry placement for piers over 30 inches, mitigation of an 18-inch seasonal high water table, and full compliance with NEC, NC Building Code, NESC, and NFPA standards. Bids open May 5, 2026 at 2:00 PM EDT; Q&A deadline April 28, 2026 at 5:00 PM EDT.
Categories
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
Greenville Utilities Commission (GUC) requests sealed proposals for furnishing and installation of foundations for the Boviet Substation located at 5442 MLK Jr. Blvd, Greenville, North Carolina 27834. The work includes complete installation of reinforced concrete foundations, site work, excavation, off-site disposal of excavated spoils, grading, backfilling, and compaction of all excavations to restore existing grade levels. The project encompasses five bid items: Control House Pad, Generator Pads, Distribution Transformer Pads and Oil Containment, Drilled Piers (consisting of nine different pier types ranging from P1 through P9 with varying quantities and concrete/rebar requirements), and Breaker Pads.
The desired project timeline for completion of work is eight (8) weeks from notice to proceed. Installation of all piers greater than 30 inches diameter requires use of permanent casings or slurry mix for placement. Permanent casings placed through impact or vibration may be quoted as an alternate method requiring owner evaluation and approval. A seasonal high water table exists at 18 inches below surface and efforts to mitigate its effects shall be considered. The scope includes furnishing all materials, supervision, labor, tools, equipment, and supplies necessary for complete installation with all construction performed in a workmanlike manner conforming to the latest editions of the National Electrical Code, North Carolina Building Code, National Electric Safety Code, and National Fire Protection Association Codes.
Key dates: Q&A deadline is April 28, 2026 at 5:00 PM EDT. Addendum 1 was issued on April 23, 2026. Bids will be opened on May 5, 2026 at 2:00 PM EDT. The site is anticipated to be ready for foundation installation around July 20th. Contractor responsibilities include obtaining and paying for all permits, licenses, certificates, and inspections required for site construction. All deliveries must be made FOB to the Boviet Substation coordinates 35°39'28.9"N 77°20'59.8"W between 8:00 AM and 4:30 PM Monday-Friday only.
Resources & contact
Proposal Document
View proposal documentSolicitation number
26-19
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in