Expired RFP

Re-Bid Peak Shaving Generator System Gas Piping

Greenville Utilities Commission is re-bidding complete design, manufacture, delivery, installation, testing, and commissioning of natural gas piping for five peak shaving generator units sourced from a 60 PSI line and connected to existing ANSI 150 4-inch flanged ball valve stubs. The scope includes API 5L Grade X52 steel pipe, ANSI B16.9 welded fittings, ASME B16.5 forged flanges, pressure testing at 100 psig for four hours minimum, and two sequential full-load tests per generator unit. Quotes due May 12, 2026 at 2:00 pm EDT to the MacGregor Downs Road site in Greenville NC.

Greenville Utilities Commission SC

Categories

Construction & Field Services Power plant operations & maintenance Transmission line construction

Important dates

  • Submission deadline

    Deadline passed

AI overview

Greenville Utilities Commission seeks quotes for the complete design, manufacture, delivery, installation, testing, and commissioning of a natural gas piping system for five peak shaving generator units. The work includes furnishing all materials, equipment, installation, permits, support stands, hangers, testing, and commissioning. The gas system will be sourced from a 60 PSI natural gas line and connect from existing ANSI 150 4-inch flanged ball valve stubs to each generator engine.

Key scope elements include: steel gas pipe installation per API standard 5L Grade X52 specifications; welded steel pipe fittings conforming to ANSI B16.9; forged steel ANSI 150 flanges per ASME B16.5; valve installation per Kerotest Manufacturing specifications; proper coating and sandblasting to NACE No. 1/SSPC-SP 5 standards; all electrical, mechanical, and pneumatic interconnections; pressure testing at 100 psig for minimum four hours; purging and tie-in operations; and a 2-hour full load test for each generator performed sequentially. The contractor must obtain all permits and licenses, provide qualified welders certified to API 1104 standards, supply temporary electrical systems, and maintain comprehensive insurance coverage.

Delivery is FOB to the property adjacent to 3280 MacGregor Downs Road, Greenville NC 27834, with prices including all costs of delivery and installation. The contractor must provide current lead-time for project completion. Work must comply with North Carolina Building Code, National Fuel Gas Code NFPA 54/ANSI Z223.1, National Fire Protection Association Codes, and all applicable EPA and state environmental standards. Performance testing with GUC representative present is required prior to shipment, with ten days advance notice mandatory.

Important dates: Questions must be received by 5:00 pm (EDT) May 5, 2026. Quotes are due by 2:00 pm (EDT) on May 12, 2026. Bidders must submit two copies of the proposal form, E-Verify compliance letter, and exception form.

Resources & contact

Proposal Document

View proposal document

Solicitation number

26-23

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in