Reconstruction of Shady Lane Substation
Bryan Texas Utilities seeks competitive bids for complete reconstruction of the Shady Lane Substation near College Station, including civil, protection and control systems, physical structure, underground utilities, and cut-in operations work; mandatory pre-bid April 28, 2026; electronic bids due June 2, 2026 by 2:00 PM CT.
Important Dates
Deadline
Due today
Published
AI Overview
This Request for Bid (RFB 018-07-26) solicits competitive bids for the complete reconstruction of the Shady Lane Substation located west of 205 Cooner Street in College Station, Texas. The project encompasses comprehensive substation construction work including civil construction, protection and control (P&C) systems, physical structure, underground utilities, and cut-in operations. The scope includes removal of existing equipment and installation of new substation components with detailed engineering specifications and construction sequencing provided in multiple appendices.
Key project dates include a mandatory pre-bid meeting and site visit on Tuesday, April 28, 2026 at 9:30 AM at the BTU System Operations Center (2200 Fountain Avenue, Bryan, Texas 77801), followed immediately by a site visit to the Shady Lane Substation. The question cut-off date is May 6, 2026 at 5:00 PM (CT). Bids must be submitted electronically by the extended deadline of Tuesday, June 2, 2026 at 2:00 PM (CT). Bid opening will be conducted publicly via Zoom immediately following submission deadline.
The bid package includes comprehensive documentation: unit proposal forms (Appendices A and B), construction package specifications (Appendix C), construction sequence plans (Appendix D), civil engineering drawings (Appendix E), protection and control drawings for both Atkins and East systems including installation and removal drawings (Appendices F, J, K, L, M), physical structure specifications (Appendix G), underground utility plans (Appendix H), and a geotechnical report (Appendix I). College Station-specific instructions are provided in Appendix N.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
018-07-26 Addendum 5