Request for Offers (RFO) for Renewable Energy and Storage Projects
San Diego Community Power is seeking renewable energy and energy storage projects with minimum 10MW AC capacity and commercial operation by June 1, 2031, including solar and wind RPS resources, 4-hour-plus battery storage, or hybrid installations interconnected to CAISO. Contract terms run 5–20 years, with preference for projects in SP15 and near member agencies in San Diego County.
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
San Diego Community Power (SDCP) is seeking offers for products from renewable energy and/or energy storage projects seeking to contract with SDCP. Eligible resources include: (1) Renewable RPS Resources, including long-lead time zero-emitting RPS-eligible resources with 80% capacity factor and RPS eligible resources providing PCC1 renewable energy; (2) Energy Storage Resources with 4-hour duration or longer; (3) Hybrid or Co-located Projects pairing RPS and energy storage resources. Projects participating in CAISO's Cluster 15 interconnection projects are not eligible for this RFO. The point of physical interconnection must be within CAISO or connected to and delivering into CAISO via firm transmission rights and pseudo-tied/dynamic scheduling, with preference for SP15 and locations near SDCP Member Agencies. Minimum capacity is 10MW AC with Commercial Operation Dates prior to June 1, 2031. Contract terms range from 5-20 years.
Resources & contact
Proposal Document
View proposal documentUnlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in