El Paso Electric is seeking 370 MW of cumulative capacity by summer 2023—50 MW needed in 2022 and 320 MW in 2023—through supply-side, demand-side, or hybrid resource proposals. The utility will evaluate single resources or mixed portfolios to meet near-term peak load requirements at lowest cost and reliability.
Important Dates
Deadline
Unknown
Published
AI Overview
El Paso Electric Company (EPE) is seeking supply-side and/or demand-side resources to meet its capacity need of approximately 50 MW in 2022 and an additional capacity of 320 MW in 2023 for a total of approximately 370 MW by summer peak 2023. EPE will consider acquiring the additional capacity through a single resource or combination of supply-side and demand-side resources that are proposed in response to this RFP. The RFP will help EPE determine how to best obtain additional low-cost and reliable electric resources to meet its customer demand by 2023.