Expired RFP

RFB for Installation of Transmission Structures and Conductors at Boviet Substation

Greenville Utilities Commission seeks installation of a new 115 kV transmission line at Boviet Substation in North Carolina, including four new transmission structures, 6,750 linear feet of 1272 AAC Narcissus conductor, 2,250 linear feet of static ground wire, and replacement of two existing poles—all materials supplied by the utility, labor and equipment by contractor. Work runs from May 4 through July 3, 2026, with liquidated damages of $4,000 per day for schedule overruns and strict NESC and OSHA compliance required for continuous load transfer and service cutover sequencing. Sealed bids due April 7, 2026 at 2:00 PM EDT.

Greenville Utilities Commission SC

Categories

Transmission line construction Substation construction Conductor & hardware Protection & controls engineering

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

This project involves the installation of transmission structures and conductors at Boviet Substation for Greenville Utilities Commission in Greenville, North Carolina. The scope of work includes construction of a new 115 kV transmission line tapping from an existing line, installation and removal of four new transmission structures, approximately 6,750 linear feet of transmission line conductor (1272 AAC Narcissus), and 2,250 linear feet of static overhead ground wire (7 No. 9 Alumoweld). Additionally, two existing transmission poles and related hardware will be replaced and transferred as depicted on detail construction drawings.

Greenville Utilities Commission will provide all materials necessary for the project. The contractor must supply all labor, equipment, and incidental items required to complete the work. The project requires strict adherence to the National Electrical Safety Code (NESC) for medium loading districts and compliance with OSHA safety regulations. Work sequencing is critical, requiring continuous and sequential performance that allows for timely transfer of existing loads, service cutovers, and retirements.

Key dates include: Pre-bid meeting on March 11, 2026 from 1:00 PM to 3:00 PM EDT; questions due by March 17, 2026 at 5:00 PM; sealed bid submission deadline of April 7, 2026 at 2:00 PM EDT; work must start no later than May 4, 2026; and on-site completion deadline of July 3, 2026. Liquidated damages are assessed at four thousand dollars per calendar day for failure to complete work within the construction schedule. The contractor must furnish performance and payment bonds equal to 100 percent of the contract price and maintain comprehensive insurance coverage including general liability, automobile liability, workers compensation, and umbrella liability.

Resources & contact

Proposal Document

View proposal document

Solicitation number

26-09

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in