RFB for Underground Cable Replacement in Rolling Meadows Subdivision
Greenville Utilities Commission is replacing underground distribution cable, pad-mounted transformers, switching cabinets, and precast equipment pads across the Rolling Meadows Subdivision in Greenville, NC, with a 91-calendar-day contract window from October 13, 2025 to January 12, 2026. Work includes full cable installation in conduit, terminations, grounding systems, and acceptance testing under NESC and applicable electrical codes. Questions deadline September 9, 2025; bids due September 18, 2025 at 2:00 PM EDT.
Categories
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
Greenville Utilities Commission (GUC) is soliciting sealed bids for underground cable replacement and related electrical infrastructure improvements in the Rolling Meadows Subdivision in Greenville, North Carolina. The project scope includes installation of underground (UG) distribution cable, cable terminations, switching cabinets, precast equipment pads, and pad-mounted transformers. All equipment pads will be replaced with new precast pads, and contractor pricing must include this work. The project is located in Rolling Meadows Subdivision and surrounding areas within Greenville, NC.
The successful contractor will be responsible for furnishing all necessary labor, equipment, and materials to complete the work except for materials and equipment specified to be furnished by GUC. Work includes removing existing materials designated on drawings, transferring materials as needed, installing cable in conduit with proper handling and termination, installing equipment pads, grounding systems, and performing acceptance tests including continuity and HiPot testing. The contractor must comply with the National Electrical Safety Code (NESC), all applicable federal and state electrical codes, and OSHA safety requirements.
Key project dates include a Questions deadline of September 9, 2025 at 5:00 PM EDT, bid submission deadline of September 18, 2025 at 2:00 PM EDT, contract work start date no later than October 13, 2025, and project completion date of January 12, 2026. The contract duration is 91 calendar days from the date of contract award. Liquidated damages will be assessed at one thousand dollars ($1,000.00) per calendar day for failure to meet the completion schedule. A mandatory pre-construction meeting will be scheduled based on the approved construction schedule.
Bidders must provide a 5% bid bond or certified check, Performance Bond and Payment Bond each equal to 100% of contract price, current contractor's license for North Carolina, proof of required insurance coverage, and documentation of good faith efforts toward minority and women business enterprise (M/WBE) participation with aspirational goals of 7% MBE and 4% WBE. The contractor must submit a proposed construction schedule, list of subcontractors, references for similar projects, and proposed project management staff with minimum 60% of workforce having five or more years tenure with the bidder's firm.
Resources & contact
Proposal Document
View proposal documentSolicitation number
25-52
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in