Expired
RFP

RFB for Underground Cable Replacement In Southgate Apartments

Greenville Utilities Commission is replacing underground distribution cable, switching cabinets, and padmount transformers at Southgate Apartments in Greenville, North Carolina, with work running June through December 2026. GUC furnishes all materials; contractor provides labor, equipment, and installation of 2-inch roll pipe, cable terminations, precast pads, and transformer replacements based on conditional assessment. Sealed bids due May 28, 2026 at 3:00 PM EDT.

Greenville Utilities Commission SC
Categories:
Distribution line construction Underground cable installation Transformer procurement

Important Dates

Deadline

Deadline passed

AI Overview

Greenville Utilities Commission (GUC) is soliciting sealed bids for the underground cable replacement project in Southgate Apartments, located in Greenville, North Carolina. The scope of work includes the installation of underground (UG) distribution cable in 2-inch roll pipe, cable terminations, switching cabinets, precast pads, and padmount transformers. All equipment pads will be replaced with new precast pads, and transformers will be replaced as needed based on conditional assessment. The contractor shall furnish all labor, equipment, and other necessary items to complete the project, with GUC providing all materials related to the installation.

Key dates and deadlines include: Pre-Bid Meeting on May 13, 2026 from 1:30 PM to 3:30 PM EDT at the GUC New Operations Center, Engineering Building, 3355 NC 43N, Greenville, North Carolina. Questions regarding the bid must be received by 5:00 PM on May 7, 2026. Sealed bids must be received by 3:00 PM (EDT) on May 28, 2026 at the Office of the Procurement Manager, 401 S. Greene Street, Greenville, North Carolina 27834. The winning contractor shall begin work after the contract award, no later than June 8, 2026, with the completion date for on-site activities set for December 4, 2026. Liquidated damages are assessed at $500.00 per calendar day for failure to complete the work within the construction schedule.

The contract will be awarded to the lowest responsible, responsive bidder based on completion date, adherence to Plans and Specifications, contractor capabilities, crew experience, past performance, and conditional quotations in U.S. dollars. A 5% bid security (cashier's check, certified check, or bid bond) is required. The successful bidder must provide Performance and Payment Bonds equal to 100% of the contract price. The contractor must maintain commercial general liability insurance with limits of not less than $1,000,000 per occurrence and $2,000,000 per project, automobile liability insurance of $1,000,000 combined single limit, and workers' compensation insurance with statutory limits. The contractor must possess a current State of North Carolina Board General Contractor's License.

Resources & Contact

Solicitation Number

26-21