RFP #26-1670-KP - PWC - VMB Life Replacement Phase 2
Snohomish County PUD seeks demolition and reconstruction of vehicle maintenance building equipment pits in Everett, WA, including excavation, removal and off-site disposal of petroleum-contaminated soils, and installation of two new lift pits with clean backfill. Engineer's estimate $450,000. Questions and substitution requests due May 15, 2026 by 2:00 pm.
Categories
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
Contract work consists of providing all labor, materials and equipment necessary for demolition and removal of existing concrete pits and slabs associated with the current vehicle lift installations within the Vehicle Maintenance Building, and the construction of two (2) new equipment pits to accommodate new lift installations. Work includes excavation, removal, handling, and off-site disposal of petroleum-contaminated soils encountered during excavation. Disposal at District's designated disposal vendor located in Seattle. Clean backfill shall be provided and placed as-needed following removal of contaminated materials. Located at 1802 75th ST SW, Everett, WA 98203, Snohomish County, Washington. Engineer's Estimate: $450,000.00. Deadline for Questions: Friday, May 15, 2026, by 2:00 pm. Deadline for Substitutions: Friday, May 15, 2026, by 2:00pm.
Resources & contact
Proposal Document
View proposal documentSolicitation number
RFP #26-1670-KP
Contact
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in