Snohomish County PUD invites bids for site improvements at the Stimson Crossing Switching Station in Marysville, WA. Work includes demolition, earthwork, and concrete pier foundations while the station remains energized. Engineer's estimate $89,200. Bids due September 24, 2026.

Snohomish County PUD WA

Categories

Substation construction Civil construction

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

Engineer's Estimate : $89,200.00. Project Description: This contract work consists of providing all labor, materials, equipment, supplies and supervision to construct site improvements to an existing electrical transmission switching station located at 3132 148th ST NE, Marysville, WA, 98271, in Snohomish County, Washington. Site construction includes but is not limited to demolition and removal of reinforced concrete foundations, temporary erosion and sedimentation controls; site preparation; earthwork; removal of surplus and unsuitable soil; cast-in-place concrete drilled pier foundations; substation rock resurfacing within the work area; and site disturbance restoration. The switching station will remain energized during construction. Contractors must be currently on the District’s Small Works Roster category "Substation General Site Construction" prior to bidding. All requests for clarification or additional information regarding this RFP must be submitted to the District via e-mail to bids@snopud.com.

Resources & contact

Proposal Document

View proposal document

Solicitation number

26-1711-KP

Contact

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in