OMPA seeks a qualified contractor for a major overhaul of its Unit 1 Steam Turbine Generator. Proposals are due August 28, 2026. The scope includes disassembly, inspection, repair, and reassembly with detailed technical specifications available.
Categories
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
The Oklahoma Municipal Power Authority (OMPA) has issued a Request for Proposals (RFP) for a major overhaul of a steam turbine generator (STG) at its generating facility. The work scope includes complete disassembly, inspection, repair, and reassembly of the turbine, with particular focus on the Unit 1 Steam Turbine Generator (U1 STG) as described in the accompanying specification document. The RFP is open to qualified contractors with experience in steam turbine maintenance, field service, and related power plant mechanical work. The project aims to restore the turbine to manufacturer specifications and improve overall reliability and efficiency.
Key dates include the posting date of July 16, 2026, and a proposal submission deadline of August 28, 2026. The RFP document, detailed technical specifications, and a legal notice are available for download from the OMPA website. Bidders are expected to review all attached documents thoroughly and submit a comprehensive proposal addressing all technical requirements, pricing, schedule, and safety plans. The exact location of the work is OMPA's power plant within the state of Oklahoma.
Technical requirements for the overhaul likely include rotor and blade inspection, bearing replacement, steam path refurbishment, alignment, and testing. The contractor must supply all necessary tools, equipment, and qualified personnel. Compliance with OSHA safety standards and OMPA's site-specific safety procedures is mandatory. The specification document (Specification - U1 STG) provides detailed engineering parameters, dimensional data, and quality assurance criteria that proposals must address.
Proposals should be submitted in accordance with the instructions in the RFP document. The evaluation criteria, while not specified on the webpage, typically include technical approach, past performance, schedule, total cost, and safety record. OMPA reserves the right to reject any or all proposals. Interested vendors should contact OMPA directly for any questions or clarification.
Resources & contact
Proposal Document
View proposal documentUnlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in