Southern Spirit DC Tie Interconnection Study
ERCOT is procuring a comprehensive interconnection study for the Southern Spirit DC Tie project, covering steady-state and dynamic stability analysis, system strength assessment, and HVDC design coordination to evaluate technical feasibility and grid integration requirements. Proposal deadline is June 5, 2026.
Important Dates
Deadline
4 days remaining
Published
AI Overview
ERCOT seeks a qualified supplier to perform the Southern Spirit DC Tie (SST) Interconnection Study. The scope of work includes steady-state and dynamic stability analysis, system strength assessment, and coordination of HVDC design data inputs. This interconnection study is critical for evaluating the technical feasibility and grid integration requirements of the proposed DC tie project.
Key dates include an optional Notice of Intent to Propose due May 19, 2026, respondent questions deadline of May 21, 2026, with ERCOT responses provided by May 25, 2026. The formal proposal submission deadline is June 5, 2026. Respondent presentations may be required at a date to be determined. The anticipated contract award and contract start date are also to be determined.
Proposals must be submitted through the Workday Strategic Sourcing (WSS) platform. Respondents are required to create a free supplier account at https://us.workdayspend.com/rfps/public/1191631 and use the WSS message center for all communications and questions. The sole point of contact for inquiries is Jason Terrell at ERCOT. All communications must be directed through the designated contact; failure to comply may result in proposal disqualification.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
05-26_JT